Battery storage in Geelong, Australia
No project on this facility has cleared the evidence bar yet. When one does it appears here with its stage and its reference.
No supply award on this facility has been sourced yet.
Every field above came from one of these pages. Read at 2026-09-16.
Owner or operator
Zerra DC lodged plans for a four-stage data centre campus near Dalby, Queensland, Australia. An anchor lease is signed, the grid is 600m away, nothing is approved.
GuideThe IMDG Code binds every packaged dangerous goods shipment under SOLAS chapter VII. IMO names eleven parts that stay recommendatory, and two of them matter here.
GuidePJM replaced its serial first-come queue with a first-ready cycle. Readiness now means a deposit and site control, including easements for half the gen tie at DP1.
GuideInspection bodies are accredited to ISO/IEC 17020 and laboratories to ISO/IEC 17025. ISO 9001 is neither. How to check a claim, and why expediting is a separate buy.