Industrial facilities

Battery storage

Grid-scale storage, stated twice: megawatts for how fast it can move energy and megawatt hours for how much it holds. Both figures are needed, and a source giving only one is giving half the answer.

By country

Battery storage on record

Geelong, Australia

Capacity:
300 MW (with a capacity of), 450 MWh (with a capacity of)
Owner:
Neoen

Latrobe Valley, Australia

Owner:
ENGIE

Australia

Capacity:
850 MW (capacity)

What this type is built from

The packages a facility of this type buys, in rough build order. Each one is a different set of suppliers, and the order is why a delay early in the sequence moves everything after it.

  1. 1Site and civil works
  2. 2High-voltage connection
  3. 3Energy storage
  4. 4Power distribution
  5. 5Export packing
  6. 6Third-party inspection
  7. 7Expediting
  8. 8Project cargo
  9. 9Customs clearance
  10. 10Bonded storage
  11. 11Rigging and heavy lift
  12. 12Fire suppression
  13. 13Building management and DCIM
  14. 14Commissioning
  15. 15Operations and maintenance

How capacity is stated

A figure without its basis is not a fact about a building. Every capacity here carries the wording its source used.

  • MWh
  • MW

Where the records come from

The classes of public record that key this facility type. A facility enters the graph through one of these, not through an announcement alone.

  • Connection and interconnection queues
  • Registered generation and storage
  • Planning and permitting portals