Data centre in Fort Worth, United States
Each entry is a change to the facility with a stage and a source, not a press release.
No supply award on this facility has been sourced yet.
Every field above came from one of these pages. Read at 2026-09-16.
Owner or operator
Zerra DC lodged plans for a four-stage data centre campus near Dalby, Queensland, Australia. An anchor lease is signed, the grid is 600m away, nothing is approved.
GuidePJM replaced its serial first-come queue with a first-ready cycle. Readiness now means a deposit and site control, including easements for half the gen tie at DP1.
GuideThe IMDG Code binds every packaged dangerous goods shipment under SOLAS chapter VII. IMO names eleven parts that stay recommendatory, and two of them matter here.
GuideInspection bodies are accredited to ISO/IEC 17020 and laboratories to ISO/IEC 17025. ISO 9001 is neither. How to check a claim, and why expediting is a separate buy.