HV and substation providers in United States
Providers serving United States. An independent listing for packers, growers and traders.
Aldridge Electric is an electrical and civil infrastructure contractor headquartered at 844 E Rockland Rd in Libertyville, Illinois, within the Chicago metro. On hyperscale data centre and other mission critical sites it self-performs medium voltage, substation and temporary power scopes and provides commissioning support services. Its substations practice covers turn-key construction from 12 kV to 765 kV with air insulated and gas insulated switchgear, including testing and commissioning.
Allison-Smith Company is an Atlanta electrical contracting and engineering firm based at 1869 South Cobb Industrial Blvd SE in Smyrna. Its ASTesting group is certified to National Electrical Testing Association standards and carries out medium voltage terminations, testing and installation, relay testing and calibration, transformer testing and breaker testing. It also runs short circuit, coordination and arc flash studies.
Burns and McDonnell is an engineering and construction firm with an Atlanta office at 4004 Summit Blvd NE that serves the south-east. Its Atlanta team provides programme and construction management for the Georgia Power Grid Investment Plan, under which around 200 miles of transmission line are being rebuilt and 36 transmission and distribution substations enhanced. Electrical transmission and distribution is one of the Atlanta office's stated growth areas.
CBS Field Services is a NETA accredited testing company with its head office in Phoenix. It tests, maintains and repairs low, medium and high-voltage apparatus on equipment rated from 480 V to 345 kV, including utility substations and data centres. Listed work covers substation maintenance and testing, protective relay testing, transformer testing and switchgear testing.
Cleveland Electric is a specialty electrical contractor at 3715 Northside Parkway NW in Atlanta, with a field service group covering north and central Georgia. Its field services include complete substation maintenance, relay and meter calibration, relay repair, cable high pot testing, transformer repair and low and medium voltage switchgear testing. The company lists an Equinix data centre in Atlanta among its field service and testing projects.
Emerald Transformer repairs, remanufactures and services power transformers and associated substation equipment, and runs a facility at 2132 South 5th Avenue in Phoenix alongside its head office in McKinney, Texas. Field crews handle on-site repair, oil processing and retrofilling, electrical testing and the commissioning of new substations. The company also carries out substation field decommissioning and laboratory oil analysis.
Great Southwestern Construction is an MYR Group subsidiary that works from offices in Mansfield and Alvarado in the Dallas-Fort Worth area. It has built and maintained substation, distribution and transmission assets for Oncor, the North Texas utility, under a master services agreement since 2014. Its wider capabilities include substation construction and energised transmission work.
Linxon delivers turnkey alternating current substations and holds the engineering, procurement and construction contract for the Arizona Public Service 230 kV Goodyear substation, which supports a data-centre expansion in the Phoenix area. Its scope on that project runs from design and engineering through construction, testing and commissioning. Its contact page lists a Phoenix office at 2398 E Camelback Rd.
Priority Power develops, builds and operates electrical infrastructure, covering grid interconnection and utility approvals, substation design and construction, and privately owned transmission and distribution from 12.5 kV to 345 kV. It lists offices at 12700 Park Central Drive in Dallas and on East Lamar Boulevard in Arlington. Data centres and high performance computing are among the sectors it names.
Quad Plus is an electrical engineering and field service company headquartered in New Lenox, Illinois, with a second Illinois office in Joliet, both inside the Chicago metro. Its field team works to National Electrical Testing Association standards on medium voltage cables and transformers, switchgear and protective relays in data centres. Services include acceptance testing, commissioning, full-system startup support and relay settings and drawing verification.
Sargent and Lundy is an engineering firm headquartered at 77 W Wacker Drive in Chicago, with a separate Atlanta-area office in Norcross, Georgia. Its grid team works on distribution substations, transmission switchyards, overhead and underground transmission and interconnection planning, including large-load interconnection support for data centres. Its data centre practice covers high and medium voltage substation design and campus layouts that size interconnection load applications.
Shermco Industries is a NETA accredited electrical testing organisation with its head office in Irving, Texas. Field services cover protection and control work from relay settings and relay testing through acceptance testing, commissioning and startup, plus transformer repair and testing, oil processing and low, medium and high-voltage breaker and switch testing. Data centres are one of the industries it lists.
Spark Testing is an electrical testing and maintenance company with a Dallas-Fort Worth office at 4900 Diplomacy Road in Fort Worth, alongside Canadian offices in Edmonton and Hamilton. It performs substation testing, commissioning and startup, protective relay testing across transmission, bus differential and transformer differential schemes, and transformer testing to NETA and IEEE methods. Other work covers medium and high-voltage breaker testing, ground grid testing and cable diagnostics.
Station Power Construction is a Phoenix contractor working on substations and on overhead and underground distribution. Its substation scope covers main switchyard installation, foundations, structural steel erection, bus work, control cable and the setting of circuit breakers, circuit switches, transformers, capacitor banks and reactors. The company works with union craftsmen and is registered with the Arizona Registrar of Contractors.
Sturgeon Electric is an MYR Group subsidiary that builds high-voltage substations, switching stations, gas-insulated switchgear and interconnect stations from 34.5kV to 765kV. Its Phoenix office on East Watkins Street runs the transmission and distribution side of the business for Arizona. Turnkey scope covers procurement, quality assurance and control, and testing and commissioning.
Tools that can help
Need a provider in United States?
Send one request and we will pass it to relevant providers here.
Run a facility in United States?
This is an independent listing compiled from public information. Listings are not endorsements, and Fernable has no commercial affiliation with the companies listed.
Related
Read morePJM's queue stopped rewarding being first: what "first-ready, first-served" actually asks you to prove
PJM replaced its serial first-come queue with a first-ready cycle. Readiness now means a deposit and site control, including easements for half the gen tie at DP1.
NewsUS opens a temporary 300,000 tonne beef quota in three tranches
US Proclamation 11059 expands the in-quota allocation for 300,000 MT of lean beef trimmings in three monthly tranches from 1 September to 30 November 2026.
NewsAmericold closes a $1.3 billion cold-storage joint venture with EQT
Americold closed a $1.3 billion joint venture with EQT covering 12 US cold-storage warehouses, EQT taking 70% while Americold keeps operating the sites.
GuideContainer demurrage and detention: what exporters actually owe and when
How container demurrage and detention charges work, why reefers cost more, and what the US FMC's 46 CFR Part 541 rule means for your invoices.
Common questions
Who do I apply to for a connection in the United States?
To the operator that holds the network licence covering the site, which may be a distribution business, the transmission operator, or a single vertically integrated utility depending on how the sector in the United States is organised. Find the licence holder and the application route before commissioning design work, because the point of connection they offer determines the substation position, the cable route and often the voltage you will build at. In markets with more than one licensed operator this step alone can take longer than the construction that follows, so treat it as the first task on the programme rather than a formality to clear once design is underway.
Can a provider from outside the United States do the work?
For testing, commissioning and transformer work, often yes, and specialists routinely travel. What does not travel is authorisation: switching and safety authorisation is granted for a site or by an operator, and many markets also require a locally licensed contractor of record to take responsibility for the installation. Ask how visiting engineers will be authorised, who holds the safety document, and which local entity signs the work off. A firm that has done this before in the United States can usually name the authorisation route from memory; one that has not will need time to find out, and that time belongs in the programme, not absorbed silently once the crew arrives.
What usually sets the programme in the United States?
The operator's study and reinforcement schedule, and the delivery time on transformers and high-voltage switchgear. Both sit outside your contractor's control and both start earlier than the construction programme. Submit the application and settle the plant ratings sooner than design maturity would suggest, and keep asking what specifically your energisation date is waiting on. A provider who cannot answer that question for the United States specifically, only in general terms, is telling you something about how closely they track the operator's own schedule.
How do I check whether a provider listed for the United States is actually reliable?
Look for a working address and contact details, and ask for references from businesses that have shipped through the United States recently rather than relying on a listing alone. Confirm the specific service you need, storage, freight forwarding, or customs handling, since a general logistics listing does not always mean deep capability in the one service that matters to your shipment. A provider willing to explain what happens when something goes wrong is a stronger signal than any credential.
Should I use a local provider in the United States or an international one with a presence there?
It depends on what matters more for your shipment. A local provider in the United States usually has deeper knowledge of ground conditions, relationships, and paperwork specific to that market, while an international provider offers a single point of contact and consistent processes if your goods also move through other countries. Many exporters combine the two: a local provider for physical handling in the United States, and a wider forwarder to manage the rest of the route.
What should I ask a provider in the United States before committing to work with them?
Ask what happens to your goods at each handover point, who is responsible if something is delayed or damaged, and what documentation they produce and when. Ask for a quote that breaks out individual charges rather than one bundled figure, so you can see what you are paying for at each stage. It is also worth asking directly how they have handled a shipment that ran into difficulty in the United States, since that answer tells you more than a general pitch.
Connection and substation work in the United States
Across the Americas the interconnection process rather than the construction is usually the long item, and the first thing to establish in the United States is who studies your request and who builds any upgrades it triggers. In the United States that is either a market operator alongside a separate transmission owner, or one vertically integrated utility doing both, and larger requests are now grouped into cluster studies, so your cost allocation and your date can move when other projects in the cluster withdraw. Distribution-connected and inverter-based plant follows state level rules and equipment certification instead, on a much shorter cycle. Canada works through provincial utilities with their own inspection and authorisation regimes, and in Latin America the model ranges from an independent system operator with published queues to a national utility that controls every step.
The safety and testing vocabulary is worth learning early, because it drives both cost and who is allowed on site. Acceptance and maintenance testing is specified through the ANSI and NETA documents, an independent test agency is the norm on larger projects rather than the exception, the site electrical safety programme follows NFPA 70E, and utility-side construction and work practice follow the national electrical safety code and the federal rules for power generation and distribution work. An arc-flash study, labelling and the working method that goes with them are expected deliverables, not extras. Where the plant standards in the United States follow the IEC family instead, check carefully which convention the operator's specification actually cites, because mixed references inside one drawing set cause procurement errors that only surface at commissioning.
Labour and licensing split along a different line here. NETA-accredited test agencies work independently of the installer on larger US and Canadian projects, so protection proving is commonly a separate contract from the civils and switchgear package. Licensing sits with the individual engineer rather than the firm, carried between states or provinces through reciprocity that is not universal, so confirm a stamp is valid in the United States before design is submitted.
Sourcing services in the United States
The United States is both one of the largest producers and consumers of food and agricultural goods in the world, and its service base reflects that scale on both the export and import sides. Grain, oilseeds, meat, dairy, fresh produce and processed foods move out through a wide network of ports on the Gulf, Atlantic, Pacific and Great Lakes coasts, each tied to different growing regions and different export corridors, while imports arrive through the same ports and through land crossings with Canada and Mexico that carry constant truck and rail traffic. Because the country is large and its production regions are spread out, inland logistics, moving goods from farm or plant to port, often matters as much as the ocean or air leg itself, and providers who specialise in inland trucking, rail drayage or barge movement on the river system are a distinct and important part of the picture.
Geography and scale also mean that no single provider or lane covers the whole country. An exporter shipping from the Midwest works with a different set of ports, carriers and inland logistics providers than one shipping from California or the Southeast, and the right choice of storage or freight provider depends heavily on where the goods originate relative to the coast or border they are moving through. Domestic distances are long enough that lead times for positioning goods at a port can be a bigger planning variable than the international transit itself. Food and agricultural exports and imports fall under a layered system of federal and state oversight, and providers who work in this space day to day are generally familiar with what documentation and inspection steps apply to a given commodity, which is one of the more useful things to look for when vetting a broker or forwarder new to a shipper.
What tends to matter most in choosing a provider here is specialisation by commodity and by corridor. A warehouse or cold store built around produce handling is not necessarily set up for bulk grain, and a customs broker experienced with meat and dairy exports is not automatically the right choice for packaged consumer goods. Ambient and dry storage capacity is as much a part of the landscape as refrigerated space, since a large share of what moves through the country is shelf-stable. References and a track record with the specific commodity and specific port or border crossing in question carry more weight than general size or brand recognition, because performance varies so much by region and by product.
A newcomer should expect a market that is highly capable but genuinely regional: providers, infrastructure and even documentation practices differ from coast to coast and between land border crossings, so the experience of shipping from one part of the country is not a reliable guide to another. The service base itself is deep, with providers across every category from storage and freight to inspection, testing and customs brokerage, but the work of a new exporter is largely about matching the provider to the specific origin, commodity and destination rather than finding a single national solution.
Choosing from a deep list in the United States
Where the listings for the United States run deep you can do something that is otherwise hard in this category, which is to separate the roles. Tender the substation build and the testing and commissioning as different packages, so the party proving the installation is not the party that made it. Shortlist by service line rather than by name, and check that a provider listed for substation build really does self-deliver protection and test work instead of passing it to whoever is free that week.
Depth in a country does not mean depth at your voltage. Confirm the highest voltage a provider has commissioned and had witnessed, whether their test sets cover primary injection and partial discharge at that level, and whether their engineers already hold authorisation with the operator that serves your site. Then check availability against your outage window, which is usually the binding constraint once the shortlist is technically sound.